New EDP solution for industrial heat electrification enters operation
EDP and Paper Prime have launched an industrial heat electrification project in Portugal. The solution allows for the replacement of part of the natural gas consumption with electricity for the steam production required in the industrial process. The project operates via a 2.7 MW electric boiler installed at the Paper Prime industrial unit.













