The Lisbon Metro (Metropolitano de Lisboa) will suspend service on the Green Line between Rossio and Cais do Sodré from May 2 to May 5. The closure is necessary for construction work on the new circular line, with normal operations expected to resume on May 6.
Lisbon metro line section to close for construction
Monday, 27 April 2026AI summary








