Road traffic on the lower deck of the Açude bridge is expected to reopen on April 10th.
Metrobus construction closes traffic on the lower deck of the Açude bridge in Coimbra
Friday, 27 March 2026RSS


Road traffic on the lower deck of the Açude bridge is expected to reopen on April 10th.

