Storm Kristin filled the Alqueva reservoir
Flows of over 500 cubic metres per second are being discharged from the Badajoz weir, forcing increased turbine operation at the Alqueva hydroelectric power station.
Público

Latest news and stories about energy generation in Portugal for expats and residents.
This page has only 1 story and is not indexed by search engines.
Flows of over 500 cubic metres per second are being discharged from the Badajoz weir, forcing increased turbine operation at the Alqueva hydroelectric power station.
